Langfang Baiwei Drill Co., Ltd.

Langfang Budweiser drilling tool manufacturing Co., Ltd

Manufacturer from China
Verified Supplier
5 Years
Home / Products / Double Wall Drill Pipe /

API Casting Joint 41/21F Threads Double Wall Drill Pipe 9.5m Length

Contact Now
Langfang Baiwei Drill Co., Ltd.
Visit Website
City:langfang
Province/State:hebei
Country/Region:china
Contact Person:MrsLily Gao
Contact Now

API Casting Joint 41/21F Threads Double Wall Drill Pipe 9.5m Length

Ask Latest Price
Video Channel
Brand Name :Long way
Place of Origin :Hebei China
Price :Negotiable
Payment Terms :T/T
Delivery Time :20-30 working days, which will be adjusted according to different products and inventory
Packaging Details :With iron
Name :Double Wall Drill Pipe
Type :Drill Pipe
Color :request
Advantage :High quality and factory price
Model :WB219/130
O.D. of the other tube (mm) :219
Other diameter of joint (mm) :130
Outer dianeter of joint (mm) :240
Type of threads :Factory standard
Effective length (m) :3M-4.5M-6M
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Rotary Drill Double Wall Or Single Wall Casing Pipe With Casting Joint

Product Description

In order to realize the reverse circulation drilling process of the through-hole DTH hammer, the supporting drilling tool system mainly includes a double-wall drill pipe. In addition to the through-hole DTH hammer used to achieve the impact effect, a reverse circulation drill bit, a dual-channel faucet, and other auxiliary tools are also required. The dual-arm drill pipe is one of its core components.

High strength double tube drilling pipe for air reverse circulation drilling in open pit mining.

Length can be made as per customer requirements, such as 1m, 1.5m, 2.0m, 3.0m, 4.5m, 6m etc.

Diameter: 102mm, 108mm, 114mm etc.

Double wall drill pipe


Type O.D.of the outer tube (mm) I.D.of the inner tube (mm) Outer dianeter of joint (mm) Type of threads Effective length (m)
WB114/65 114 65 156 41F 6
WB127/76 127 76 162/168 41/21F 6 , 9.5
DB127/76 127 76 184 51/2FH 9.5
WB140/88 139.7 88 184 51/2FH 6,9.5
WB219/130 219 130 240 Factory standard 6,9.5
WK76/32 76 32 78 3" Remet 3
WK102/41 102 41 103 4" Remet 3 , 6
WK114/52 114.3 52 116 4 1/2" Remet 3 , 6
WK114/38 114.3 38 114.3 4 1/2" Metzke 3 , 6
WK114/50 114.3 50 114.3 4 1/2" Remet 3 , 6
WP50/20 50 20 50 1 , 1.5
WP73/35 73 35 73 1 , 1.5
WP89/40 89 40 89 1 , 1.5

Forged connector

The connector material is forged, has an improved material density, and changes the fiber texture of the material, thereby greatly improving the general mechanical properties of the material. The end ensures that the thread is anti-corrosion, anti-sticking, and improves the fatigue resistance of the joint surface.

Upsetting & thicking

Upsetting & thicking to the rods have improved The metallurgical structure and enhanced the Impact toughness, that have ensured comprehensive Mechanical properties and the friction weld seals Not be broken.

API Casting Joint 41/21F Threads Double Wall Drill Pipe 9.5m Length

About us

LangFang Baiwei Drill Co.,Ltd located in the center of Beijing, Tianjin and Hebei-Yongqing Industrial Area. Langfang Hebei.

Our company is a drilling tools manufacturing enterprisewith integration of design, geological, well, double wall, oil, auger and other special drilling pipes. And trenchless special drilling tools such as pilot guide bits,swivels, reamers, sub saver, pneumatic pipe rammer, pipe bursting machine.

We have specially invited domestic wellknown expert Mr.zhou shengfeng as our general manager who engaged in the HDD drilling tools and processing technology as technical consultant. A solid research team lays the foundation of product quality, new product development and after-sales service.

FAQ


Q: Are you trading company or manufacturer ?
A: We are factory.

Q: How long is your delivery time?
A: Generally it is 7-30 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample need to pay the cost of products and freight.

Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

Inquiry Cart 0